I got here reeeeeaaaaly early this morning, so here's an early update now that I'm taking a little breather.
I continued with trying to refine the hinges for the new entry door. The A-26 gear door hinges didn't work out, but I hit the motherload when I found two more hinges out on the 'pile-o-stuff' that we have out here. They even had some structure with them that I can use and will save me design and fabrication time.....
Before I got too far along, I tried the hinge out to see if it would end up with the correct travel that is needed for this door. It worked well......
Once I knew those hinges would work, I started to mount them to the door frame. Some modification was required, and I will build additional structure to beef the frame back up once all of the fitting is done. In this photo, you can see that one hinge is already in place, and I am just about to cut the slot out for the second one.........
Here they are, clecoed to the door frame and the hinge pivots bolted to them. The pivots will be riveted to the piece of skin that is where the lower portion of the door used to be.......
I screwed up some measurements, because I'm dumb as a box of rocks, and will have to remake that lower section of skin, but it did work out as a nice pattern for me to do it right the next time I build it. At least the holes are in the right spots now.

Anyway, here is the door closed and latched.......
And here it is in the open position, hanging on the hinges........
I will get another update out when I get more done. One thing I did forget to mention though, is that I have got a couple of our Squadron members here helping for the next couple of days. It's great to see them pitching in. Maybe all of my incessant whining somehow worked.
Gary