Rhino-9-3 wrote:
Sorry guys, been away for school again and haven't really had the chance to keep things going on here. I'm going to try to get another one of the crew members to continue things where I left off, hopefully soon!
Hey Ryan,
I will jump in here if you don't mind.
Current mini-projects in progress are:
1) Construction of an 8'x16' media blast booth is almost complete (just waiting for air lines to be installed). This will allow us to do virtually all blasting in-house of engine cowls, undercarriage doors and valances, vertical stabs, large access panels, etc.
2) Engine #1, which had an aborted re-build attempt, is having all parts crated in preparation to be sent to Jack Rousch in Detroit for a complete overhaul (once we come up with $150K).
3) All undercarriage doors and valances have been removed and are in the process of being de-riveted and re-skinned.
4) A lot of paint stripping was completed over the summer, mostly on the remaining engine cowls and covers.
5) It has been decided to leave #2 engine and prop on the aircraft at this time. #3 and #4 engines are in the CH2A hangar on engine stands. #2 radiator assembly was removed to allow for corrosion inhibition. Further oiling of this engine and firewall assembly will continue.
As she sits in the quonset (before the remaining undercarriage doors and rad were removed):