Warbird Information Exchange

DISCLAIMER: The views expressed on this site are the responsibility of the poster and do not reflect the views of the management.
It is currently Sat Jun 07, 2025 5:49 am

All times are UTC - 5 hours


Classic Wings Magazine WWII Naval Aviation Research Pacific Luftwaffe Resource Center
When Hollywood Ruled The Skies - Volumes 1 through 4 by Bruce Oriss


Post new topic Reply to topic  [ 40 posts ]  Go to page Previous  1, 2, 3
Author Message
PostPosted: Sat Mar 05, 2011 12:02 am 
Offline
1000+ Posts!
1000+ Posts!
User avatar

Joined: Sun Nov 15, 2009 12:57 pm
Posts: 1263
Location: Lacombe, Alberta, Canada
The Inspector wrote:
Wrought iron is pretty soft stuff, it might work in this 'one time' application, try cruisin' the backside of the MOTEL 6 with a pair of red handled 'extra keys' or, do you have a metals dealer in the area? see if he'll let you dig in his scraps skid tub for something that would work better than soft iron. If you find something, give him $5 and he'll remember you next time.


I got a buddy with a welding shop, just that everything right now is under ten feet of snow!

_________________
Defending Stearmans on WIX since Jeff started badmouthing them back in 2005.


Top
 Profile  
 
PostPosted: Sat Mar 05, 2011 8:18 am 
Offline
User avatar

Joined: Sun May 02, 2004 3:57 am
Posts: 926
Dan Jones wrote:
I'd have to see a picture of a P-38 wing's structure before I could even imagine what they were up against, but there was some pretty bright guys back then designing that stuff.

The tool I'm making for that tab I think is going to be very simple but not what you would use for production. For the three or four I'll make I expect that it'll work out fine but I'd love to know what Boeing actually used. I do know that Consolidated employed midgets for bucking rivets in some of the PBY's structure. I remember I was happy camper the day I could no longer fit down the inside of a Twin Otter float to buck!



Mr.Jones,midget is no longer PC its little people.we nolonger have retards nor mongoloids either

_________________
"WHAT ME WORRY?"


Top
 Profile  
 
PostPosted: Sat Mar 05, 2011 11:44 am 
Offline
3000+ Post Club
3000+ Post Club
User avatar

Joined: Thu Sep 28, 2006 12:56 pm
Posts: 3442
Location: North of Texas, South of Kansas
Dan,

Take your least favorite bucking bar that can be trimmed to fit inside the tab and simply weld (or drill and tap a hole) a long handle onto it made from redi-bolt or rebar or whatever is close at hand. Shooting from the middle to each end alternately, like I mentioned in the PM, will also help keep the deflection problem down. If you have helpers you could place the bar in the middle of two handles and your troops could run them from either side to maintain proper bucking pressure.

Scott


Top
 Profile  
 
PostPosted: Sun Nov 06, 2011 4:11 pm 
Offline
1000+ Posts!
1000+ Posts!
User avatar

Joined: Wed Sep 17, 2008 8:52 pm
Posts: 1216
Location: Hudson, MA
How did this work out?

_________________
"I can't understand it, I cut it twice and it's still too short!" Robert F. Dupre' 1923-2010 Go With God.


Top
 Profile  
 
PostPosted: Sun Nov 06, 2011 5:56 pm 
Offline
Long Time Member
Long Time Member

Joined: Sat Dec 22, 2007 12:36 am
Posts: 7961
Location: Mt. Vernon, WA.
Dan,
I was checking in with some friends @ KPAE a few weeks ago to see 'wassabi?' and found that they are working on an inherited project out of Colorado, a new build model 32 A6M, dude some of the almost microscopic places that rivets through letter slot wide gaps in the wings to rivet the skins to the ribs and frames made my head hurt trying to figure out how to access the tails to buck without seeing if your three year old grandson can hold a #4 bucking bar! A gazillion 1/8th holes and everyone dimpled/countersunk.

_________________
Don't make me go get my flying monkeys-


Top
 Profile  
 
PostPosted: Sun Nov 06, 2011 7:55 pm 
Offline
1000+ Posts!
1000+ Posts!
User avatar

Joined: Sun Nov 15, 2009 12:57 pm
Posts: 1263
Location: Lacombe, Alberta, Canada
It's funny you guys should post this today - just this afternoon I started playing with the tabs again after months of tripping over a ten foot long strip of specialty steel that I had to order in March to make the bucking strip out of. The tabs took a backseat to getting the seats finished and mounted, the bulk of the electrical system created and installed, and building an aileron jig for two decidedly weary ailerons. Long story short... I'll have an update for you shortly (provided it works!) If it doesn't work, I will be publishing a short list of what not to try. :?

Some years ago, well before it was finished, I saw the collection of Zero bits that Blayd Corp had in storage at their facility in Carmen. I was really, really impressed by how labor intensive building/rebuilding a Zero is. It seems like the whole thing was made up of tiny, little pieces all riveted together. It sure didn't look like it was designed for mass production.

_________________
Defending Stearmans on WIX since Jeff started badmouthing them back in 2005.


Top
 Profile  
 
PostPosted: Mon Nov 07, 2011 9:25 pm 
Offline
Long Time Member
Long Time Member

Joined: Sat Dec 22, 2007 12:36 am
Posts: 7961
Location: Mt. Vernon, WA.
Yeah, it's intense to be sure! And will be intense to do all the riveting, Merthiolate in a pump sprayer please. But it's from the same folks who historically do joinery that makes Quaker mortises look like two boards stuck together with a rock and a rusty nail!

I've been giving this some thought and I'll bet the originals were done with a very deep jawed 'C' squeeze mounted to a bench, you'd do half the rivets, flip the part end for end, and install the rest of the rivets

_________________
Don't make me go get my flying monkeys-


Top
 Profile  
 
PostPosted: Mon Nov 07, 2011 9:44 pm 
Offline
1000+ Posts!
1000+ Posts!
User avatar

Joined: Sun Nov 15, 2009 12:57 pm
Posts: 1263
Location: Lacombe, Alberta, Canada
The Inspector wrote:
I've been giving this some thought and I'll bet the originals were done with a very deep jawed 'C' squeeze mounted to a bench, you'd do half the rivets, flip the part end for end, and install the rest of the rivets


Maybe... Pretty shallow piece though for a squeezer. I think I have it figured out how to do it, so I should have an answer here in a day or two. Stay tuned.

_________________
Defending Stearmans on WIX since Jeff started badmouthing them back in 2005.


Top
 Profile  
 
PostPosted: Mon Nov 07, 2011 9:47 pm 
Offline
Long Time Member
Long Time Member

Joined: Sat Dec 22, 2007 12:36 am
Posts: 7961
Location: Mt. Vernon, WA.
As long as it don't sound like you're trying to get even with the anvil! :lol: :lol:

_________________
Don't make me go get my flying monkeys-


Top
 Profile  
 
PostPosted: Sun Apr 29, 2012 4:51 pm 
Offline
1000+ Posts!
1000+ Posts!
User avatar

Joined: Sat Oct 07, 2006 9:24 pm
Posts: 1748
Location: atlanta,georgia
I have an idea how the part was riveted.Boeing had to buck the rivets inside of the spar tubes and carry throughs. The used a two part bucking bar with one piece sliding along the channel of the other.It has handles on both pieces.I bucked some rivets in the P-38 way back and that is what I used.It was in the corregation

_________________
Hang The Expense


Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 40 posts ]  Go to page Previous  1, 2, 3

All times are UTC - 5 hours


Who is online

Users browsing this forum: No registered users and 11 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
Powered by phpBB® Forum Software © phpBB Group